Asked this question in an earlier post but as Greybeard suggested it may be better posted separately.
I am intending to rebuild my gearbox, 51 A10 Plunger, but it will not go into service for a couple of years. Yes that's right, a couple of years. This is a long retirment project when I get aroung to retiring. My question is can I rebuild it now and put it on the shelf. What would I have to do to make sure it is still mickey mouse in a couple of years. Any thoughts?
Russ
1951 A10 Plunger.
Australia

Offline Greybeard

  • Jack of all trades; master of none.
  • Wise & Enlightened
  • *
  • Join Date: Feb 2011
  • Posts: 9838
  • Karma: 49
Re: Gearbox rebuild for the future
« Reply #1 on: 14.08. 2017 17:58 »
My worry would be the seals taking a permanent distortion.

I recently had an issue with gaskets on my Plungie box. If I'd rebuilt the box years ago and then had problems that meant a fresh strip-down when I needed it I would not have been happy.
Greybeard (Neil)
2023 Gold Star
Supporter of THE DISTINGUISHED GENTLEMAN'S RIDE https://www.gentlemansride.com

Warwickshire UK


A Distinguished Gentleman Riding his 1955 Plunger Golden Flash

Online morris

  • Wise & Enlightened
  • *
  • Join Date: Aug 2012
  • Posts: 1767
  • Karma: 27
  • Antwerp, Belgium
Re: Gearbox rebuild for the future
« Reply #2 on: 14.08. 2017 18:37 »
I think there's nothing against it to rebuild the box and loosely assemble it well oiled, minus sprocket seal and gaskets and storing it in a warm and dry place (next to the central heather for example)
Before finally installing the box it'll then be about an hours work re-oiling the innards and installing seal and gaskets.
'58 BSA A 10 SA
'52 BSA A 10 Plunger
'55 MORRIS ISIS
The world looks better from a motorbike
Belgium

Offline Russ

  • A's Good Friend
  • ***
  • Join Date: Aug 2009
  • Posts: 247
  • Karma: 1
Re: Gearbox rebuild for the future
« Reply #3 on: 15.08. 2017 00:21 »
Thanks Morris that sounds like a good plan and will eliminate the issue with gaskets that Greybeard had.
Russ
1951 A10 Plunger.
Australia

Offline bikerboy

  • Valued Contributor
  • ****
  • Join Date: Dec 2011
  • Posts: 436
  • Karma: 4
Re: Gearbox rebuild for the future
« Reply #4 on: 15.08. 2017 01:11 »
One of my swinging arm gearboxes was not used for 35 years and all I did was change the oil  *smile*

My plan was to try it and see if it was ok, that was 2 years ago and its still fine

Depends on your luck and if you have a garage which is reasonably warm most of the time I think